ERP-Logistics System Design and Implementation Project

Project Title

ERP-Logistics System Design and Implementation Project

Client

HUGO BOSS AG Metzingen, Germany

Dates

2000-2003

Project Details

The project consists of three major phases: These are (I)Project Preparation, (ii)Analysis, Design Phase (iii)Development and Implementation. Hugo Boss is one of the biggest companies world-wide in clothing industry. Among the short list including other software vendors from Europe and United States, KMO has been selected and contracted with Hugo Boss AG (headquarters in Germany) to accomplish the project. KMO-AIMS methodology is fully being implemented in the project including project management, project organisation, system logical and technical design and documentation standards, quality assurance, configuration management, software standards, development life cycle.

The services given in the first phase include; preparing project standards, hardware configuration and database configuration design, preparation and set up. Training of MIS staff concerning the methodology, standards, database and tools.

As the result of the second phase, requirement analysis, fit/gap analysis (this is performed to determine the percentage of fit of KMO's ready reference models and reusable objects), logical and preliminary technical designs have been accomplished.

Services provided in ongoing third phase include development and implementation supported with technical assistance and supervision. Completed modules have been migrated into deployment system. The project is planned to continue for Hugo Boss Production System world-wide.

(*) KMO Consulting has been rewarded with "International Project Success Award" for HUGO BOSS AG Germany ERP-Logistics Software Project in "Annual Turkish Information Technology Awards" Event in 2003 organised by Interpro, Turkey