References and Experience
Technical Assistance Projects
ICT Service Projects
Management Consultancy Projects
Training References
Success Stories
Testimonials
Selected Project Information
Please find information about some selected projects in chronological order:

Project TitleDevelopment and Maintenance of Environmental Information System
Origin of FundingEU Funded (EuropeAid/123041/D/SER/TR/BIS)
Client Ministry of Environment and Forestry
Dates December 2007 - November 2008
PartnersTRASYS S.A. (BE), EPSILON International (GR)
Project DetailsProvision of Technical Assistance to Turkish Ministry of Environment and Forestry (MoEF) in the form of specialized consultants to achieve the objective of Development and Maintenance of Environmental Information Systems (EIS), in order to support the following overall objectives;
  • Enable Turkey to achieve a high level of environmental protection.
  • Compliance with the EU access to environmental information and reporting directives.
    The infrastructure and main building blocks of the Environmental Information System has been implemented in previous project. Based on its outputs this project has been directly linked to the output of Access to Environmental Information and Institutional Building project.
    In order to enable structured monitoring and management, the project activities have been categorised into phases as described below:

    1. Initiation and Inception Phase:
    Project Standards and methodology has been established in close co-operation with the MoEF project team including;
  • Project work plan
  • Detailed work approach
  • EIS Change management process definitions
  • Test - acceptance process definition and Acceptance Criteria (AC)
  • Project standards and forms
  • Change Management Group in MoE&F to evaluate and implement the needs and changes to the EIS.
  • Project organisation and team-up structure with roles and responsibilities.

    2.EIS Infrastructure Phase :
    Strengthening the technical infrastructure of EIS system environment, database and applications and building capacities in ICT technologies for EIS.
    Technical studies include but not limited to the following;
    Metadata, Templates, Overall System Functionality, Logging, Authentication and Authorisation Mechanism, Data Quality Assurance Mechanism, Paging, Advanced Search, Reports Engine. The achieved results are Sustainable EIS by technical training and close cooperation and visible EIS.

    3.EIS Modular Enhancement Phase :
    EIS modular functional and technical improvements and enhancements have been implemented including but not limited to the following;
    Functional enhancements and improvements on the EIS modules have been implemented. New modules and functionality have been incorporated into the system. EIS system incorporates the following main modules; General Information Module, Noise Module, Inspection, Waste, Water, Air, Coast and Sea, Soil, State of Environment Reporting, Geographic Information System Module.
    EIS has been enhanced with comprehensive Geographical Information System designed developed and integrated with EIS.
    Technical enhancements on the system include Single Sign-on capabilities to support the utilisation of EIS related systems from single entry portal environment. Data management capabilities have been greatly improved with design and development of data management module to incorporate all environmental relevant data into EIS database and applications.

    4.EIS Dissemination Phase: Dissemination activities have been executed including the training of EIS to selected user base as determined by MoEF and to create environmental awareness incorporating the following activities:
  • Preparation of Training Strategy and Training Programme
  • Preparation of Training Material and Database
  • Execution of EIS Trainings, Evaluation of Training and Certification
  • Communications and Visibility Outputs (EIS poster: EIS brochure)
    The EIS system visibility and sustainability is supported with prepared documentation and trainings to the MoEF IT department. TA has been provided for establishment of EIS Workgroup organisation structure and teams within MoEF for sustainability of EIS.
  • Project TitleEU Technical Assistance for analysis of Integrated Tariff Management System (ITMS) integration, Common Transit Convention (CTC) requirement compliance and migrating BILGE to web-based technology, Turkey
    Origin of FundingEU Funded (EuropeAid/122780/D/SER/TR)
    Client Prime Ministry, Undersecretariat of Customs
    Dates November 2006 - November 2007
    PartnersTrasys S.A. (BE), Charles Kendall & Partners (UK), Intrasoft International (LU)
    Project DetailsProvision of Technical Assistance to TCA in the form of specialized consultants to achieve the objective of "Develop and Enhance EU compatible Customs IT systems in line with the EU Acquis, by improving current systems and establishing new technical framework and new technology infrastructure".

    Major activities implemented throughout the project are:

    Component 1-2 :ITMS & BILGE-web
    • Analysis and Comparison of TIT of BILGE and ITMS systems,
    • System Design and Modelling of ITMS and its sub-systems integrated with BILGE,
    • Determine Appropriate Functional and Technical solutions for ITMS implementation in line with BILGE future strategies,
    • Provision of management support and technical support to TCA in Terms of Reference for ITMS service contract, and Project Inititaion Document,
    • Analysis of BILGE using methodology and supportive software tools,
    • Definition of technical strategy allowing TCA IT to reach the objectives specified.
    • Description of possible technical options and various implications in full.
    • Definition of the web based future development strategy and technology,
    • Provision of know-how and best practices in the EU, including but not limited to ITMS and web based customs applications
    Component 3:CTC
    • Analysis and identification of Legislative Gap and Needs for Common Transit Convention and Customs Regulation,
    • Preparation of Action Plan based on analysis study results,
    • Provision of interactive workshops on results of analysis, action plan and other relevant context.
    Project TitleTechnical Assistance for Strengthening the Fight against Money Laundering, Turkey
    Origin of FundingEU Funded (EuropeAid/116585/D/SV/TR)
    Client Ministry of Finance, Financial Crimes Investigation Board (MASAK)
    Dates November 2004 - July 2006
    PartnersRambøll Management (DK), FINNTYR, OY (FI & TR)
    Project DetailsProvision of Technical Assistances to achieve the objective of enhancing the institutional capacity of MASAK in order to fight against money laundering efficiently in the framework of harmonization with the EU Acquis concerning money laundering, establishment of the technical framework and technical infrastructure.

    The main components of the project are:

    Component 1 - Security Policy: This component includes organisation wide security risk analysis and risk assessment, preparation of security policy and standards at all levels (General, ICT systems including HW, NW, SW) monitoring and audit of implementation.
    Component 2 - Control and Inspection: Technical assistance in implementation of hardware and network and relevant software and equipment. Assisting preparation of evaluation criteria, controlling, testing, guidance on inspection and acceptance.
    Component 3 - Database and Software : Technical assistance in implementation of all the software components including COTS, database and custom developed applications. Configuration and customisation of COTS, integration of all the software items, verification & validation of software development life cycle and outputs, database configuration, security & performance, back-up strategy and disaster recovery, data migration and integration.
    Component 4 - Training: The training component covers the planning, preparation and co-ordination of the training, the training of the MASAK experts, IT Training courses to IT staff and evaluation and certification.
    Project TitleEUROPEAN UNION Centre for Education and Youth Programmes Web Portal and Content Management Design and Development Project
    Origin of FundingEU Funded (MER/TR/HIZ/TL/04/22)
    Client EU National Agency Turkey
    Dates May 2004 - December 2004
    Project DetailsUnder this project;
    • Web portal design of programs (Socrates, Leonardo, Youth) have been designed and developed to be utilised on internet,
    • Web portal content is designed and implemented to be dynamically created by privileged users in the organisation and managed dynamically in database,
    • Content entry, query and approval application system has been designed and developed,
    • Database, Application Server, Portal and web development tools are utilised for development of web portal and content approval system applications.
    Project TitleERP-Logistics System Design and Implementation Project for HUGO BOSS AG (*)
    Client HUGO BOSS AG
    HUGO BOSS Ltd.
    Dates 2003 - 2004
    Project DetailsThe project consists of three major phases: These are (I)Project Preparation, (ii)Analysis, Design Phase (iii)Development and Implementation. Hugo Boss is one of the biggest companies world-wide in clothing industry. Among the short list including other software vendors from Europe and United States, KMO has been selected and contracted with Hugo Boss AG (headquarters in Germany) to accomplish the project. KMO-AIMS methodology is fully being implemented in the project including project management, project organisation, system logical and technical design and documentation standards, quality assurance, configuration management, software standards, development life cycle.

    The services given in the first phase include; preparing project standards, hardware configuration and database configuration design, preparation and set up. Training of MIS staff concerning the methodology, standards, database and tools.

    As the result of the second phase, requirement analysis, fit/gap analysis (this is performed to determine the percentage of fit of KMO's ready reference models and reusable objects), logical and preliminary technical designs have been accomplished.

    Services provided in ongoing third phase include development and implementation supported with technical assistance and supervision. Completed modules have been migrated into deployment system. The project is planned to continue for Hugo Boss Production System world-wide.

    (*) KMO Information Systems has been rewarded with "International Project Success Award" for HUGO BOSS AG Germany ERP-Logistics Software Project in "Annual Turkish Information Technology Awards" Event in 2003 organised by Interpro, Turkey
    Project TitleTURKCELL Corporate Solution Centre (CSC) Project
    Client TURKCELL
    Dates 2005 - 2006
    Project DetailsUnder this project;

    KMO provided Turkcell with a business plan which included the idea of establishing Corporate Care Management Centres;

    Upon project acceptance, Turkcell appointed four different Corporate Solutions Centres founded as separate legal entities.

    K Mobile Technology Information Ltd. Co. (KMT) was founded in February 2005 with the objective of answering the expectations of the Turkcell clients with the customer management service provided by Mobile Technology Consultants

    KMT has undertaken the management of more than 2.000 corporate customers of Turkcell located in Central Anatolia, mainly in Ankara with a team of about 20 personnel all of which were provided with the following trainings: Coaching, Sales Skills, Customer Relationship Management, Building up and Managing a Team, Technological Trainings, Turkcell Mobile Solutions.

    The performance monitoring system based on "Balanced Score Cards" developed by KMT has become a reference to the other CSC's as well as Turkcell.

    KMT provided its clients with any kind of mobile solutions possible on GSM platform and provide assistance for choosing the right tariff for their needs via tariff consultancy.

    Organisational structuring of Corporate Solution Centres has become one of the most successful practices of Turkcell in 2005.

    KMO Information Systems
    Phone: +90 312 438 71 27 / Fax: +90 312 440 84 77
    Address: Alper Sok. No:6/11 Çankaya 06550 Ankara TURKEY
    CONTACT KMO SITEMAP TURKCE E-MAIL KMO
    HOME